Our Septic Construction Process
Step 1
Site Evaluation and Soil Testing
We conduct a mandatory site evaluation, arranging for deep soil testing (percolation tests) to determine how well your specific Jacksonville property can absorb and filter treated wastewater.
Step 2
Custom System Design
Based on the soil results, the size of your new home, and the depth of the local water table, we engineer a custom septic tank and drain field layout that meets all Florida Department of Health requirements.
Step 3
Permitting and Approvals
We handle the entire complex bureaucratic process, submitting our engineered designs to the local environmental agencies to secure all necessary permits before any dirt is moved.
Step 4
Excavation and Installation
Our heavy equipment operators carefully excavate the site. We securely set the heavy septic tank, lay the necessary distribution pipes, and construct the drain field using high-quality gravel and filtration materials.
Step 5
Final Inspection and Covering
After the installation passes the strict municipal health inspection, we carefully backfill the trenches and grade the soil, leaving your property leveled, safe, and ready for landscaping.